CSU Ardec Bridge Replacement

FORT COLLINS, CO

Hoff Construction was the general contractor for construction of the ARDEC bridge replacement for Colorado State University research farm.

Our scope of work included demolition of the existing timber bridge and concrete abutments and construction of larger steel reinforced concrete footings and abutments for the 34ft x 32ft steel bridge with steel and concrete decking and concrete apron. Our work also included dewatering, riprap, site work, fencing and seeding.